Home / News & Events / Dual control of energy consumption engineering plastic factory delivery ?

Dual control of energy consumption engineering plastic factory delivery ?

Sep. 30, 2021

Last year, the Chinese government has officially announced that China aims to reach peak emissions before 2030 and achieve carbon neutrality before 2060, which means that China only have 30 years for continuous and rapid emissions cuts. To build a community of common destiny, the Chinese people have to work hard and make unprecedented progress. 


To commit the promise to the world that China will meet the emission peak in year 2030 and carbon neutrality in year 2060, Chinese local governments have taken strict-ever actions to reduce release of CO2 and energy comsumption by restricted supply of electricity power. 

 

Some areas supply 5 days and stop 2 days in a week, some supply 3 and stop 4 days, some even just supply 2 days but stop 5 days.

These actions will result in a terrible increase of all costs, from raw materials to packing materials, from labor cost to ports operation costs. 


This greatly affect all production plan , and for those samll factories , they can not keep a on time delivery and even shut down at this period . 

Abosn dezhou New materials  factory have been doing engineering plastic for more than 30  years , even this greatly affect our factory production plan but for now we already make arrangment for each order as scheduled , to keep our customer delivery . 


Our factory have been in this line for more than 30 years , UHMWPE &HDPE products is our strenght products , our products including : 


https://www.abosnpesheets.com/uhmwpe-products/

https://www.abosnpesheets.com/hdpe-and-pp-products/

https://www.abosnpesheets.com/ground-protection-mats/

https://www.abosnpesheets.com/ice-hockey-rink-products/


if you have more request , feel free contact with us freely .

email [email protected] 








back to list
Share
hot news